Help and answers

Search, or pick a topic.

Getting started

Do you charge for the first design?

No. Your first design is the one you make in the 3D designer. It is free to use and shows a guide price. Engineering drawings and calculations for planning and building control follow once you decide to go ahead.

Do you offer finance?

Yes. We work with a trusted finance partner, UK Asset Solutions, who have brokered many projects for our customers. They offer asset finance (hire purchase and leasing), refinancing, contract hire, commercial mortgages, commercial business loans and cash flow funding.

To talk about your options, contact barrie@ukassetsolutions.co.uk. Finance is arranged by UK Asset Solutions. The prices on this site do not include finance costs.

What does a quote include?

You get an itemised written quote for the option you choose: kit, supply and erect, or turnkey. It lists what is included and what is not, so you can choose to put the building up yourself or use your own groundworker.

Is delivery included?

No. Delivery is priced separately from the building and shown on your quote. We deliver to anywhere on mainland UK. Islands, including the Isle of Wight where steel crosses by ferry, and overseas sites are quoted on request.

Can you hand over a shell, or does it have to be finished?

Either. We can hand over a weathertight shell-and-core building ready for your own fit-out, or a turnkey building with internal walls, finishes, lighting, power and electrics to your specification.

How long does it take?

A typical 18 × 30 m unit takes 10 to 16 weeks from order, plus planning time. Fabrication runs while the groundworks go in. See the programme →

Steel building cost per m² in the UK

SpecificationGuide £/m²Includes
Small kit, supply onlyfrom £70Frame, sheets, fixings, drawings, delivery
Erected and cladfrom £200Frame, cladding, doors and erection, no groundworks
Turnkeyfrom £350Foundations, slab, building, doors, lighting and power

Guide figures for 2026, excluding VAT. Larger buildings cost less per m². Steel prices rose sharply in 2026, so check how long any quote is held. Read the full cost guide, with a size-banded price book →

What changes the price most

Span. Wider clear spans need deeper rafters. An internal column line can cut frame cost on very wide buildings.

Eaves height. Taller walls mean more cladding and heavier columns. Set it from your tallest vehicle or racking, plus clearance.

Location. Exposed coastal and upland sites carry higher wind and snow loads, which means more steel.

Cladding. Insulated panels cost roughly twice single skin but are needed for heated space under Part L.

Openings. Big doors and glazed fronts need extra framing. Decide them early so the frame is designed around them.

Try it in the 3D designer →

Planning and regulations

Do I need planning permission?

Almost always, for a new commercial building. Some extensions to existing industrial and warehouse buildings in England can be permitted development under Class H of Part 7, within size and boundary limits.

Because the building is made to order, details such as height, door positions and cladding colour can be adjusted before the application goes in, to suit the site and the planning officer. We prepare the drawings and can manage the application. Allow 8 weeks for a decision, or 13 weeks for major developments.

What about Building Regulations?

Almost every new building needs Building Regulations approval from building control. The main parts are A (structure), B (fire safety) and L (energy). Our design pack includes the structural calculations and U-values building control will ask for.

General guidance only. Rules differ between England, Wales, Scotland and Northern Ireland, and your local planning authority makes the decision.

The rules we design to

What has to happen before a steel building goes up?

Four things, in this order. First, planning permission from your council, or prior approval for some farm buildings. Second, a structural engineer designs the frame and foundations for your site's wind and snow loads. Third, building control approves the plans under the Building Regulations. Fourth, the steel is made, delivered and put up. For a commercial building, building control usually needs full plans, not a building notice. At the end, building control inspects the work and issues a completion certificate, and you receive the as-built drawings and the health and safety file.

How is a steel building measured?

To the steel line. Span, length and eaves height are measured to the outside face of the steel frame, with heights from the finished floor. The eaves height is where the outside of the column meets the top of the rafter. The side rails and panels sit outside that line, so with 80 mm panels on 145 mm rails the building is about 225 mm bigger on each clad side. Inside, the columns and haunches take some room: on a 15 m span the clear width between columns is about 14.3 m, and the clear height under the haunches is a little below the eaves. The designer and our drawings show all three.

What types of portal frame are there?

The common one is the pitched-roof portal: two columns and two rafters meeting at a ridge. Others are the mono-pitch portal (one slope, up to about 15 m span), the propped portal (a slim prop mid-span for very wide buildings), the tied portal, the crane portal, and frames with mansard, curved or cellular rafters. Any of them can have a mezzanine. The 3D designer covers pitched-roof portals and open mono-pitch canopies.

What are the usual proportions of a portal frame?

Roof pitch is usually 5° to 10°, with 6° the most common. Frames are spaced 6 to 8 m apart. The eaves haunch is about a tenth of the span long. Purlins are usually 1.5 to 1.8 m apart. Single spans are most efficient up to about 35 m. The designer checks your building against these and tells you when something is outside the usual range.

What stops a portal frame moving sideways or twisting?

Three things. Cross-bracing in the roof and walls of a braced bay takes wind along the building, and eaves beams carry the load to it. The rigid joints between columns and rafters take wind across the building. Short stays from the purlins and rails hold the inner flanges of the rafters and columns so they can’t twist, and anti-sag rods keep the purlins straight.

What if my building is close to the boundary?

A wall within about 1 m of the site boundary must resist fire so it can’t spread next door. That usually means mineral wool wall panels, fire protection to the columns up to the haunch, column bases designed to hold the wall up in a fire, and limits on doors and windows in that wall. Further from the boundary the limits ease. Tick the boundary box in the 3D designer and it checks the cladding and fire protection for you.

Which Building Regulations matter for a portal frame?

Mainly Part A (structure), Part B (fire safety, including escape routes and distance to the boundary), Part L (insulation and energy, for heated buildings) and Part M (access, for buildings people visit or work in). Part C (condensation) and Part K (guarding, for example on a mezzanine) can apply too.

How is the frame designed?

To Eurocode 3 (BS EN 1993-1-1) with the UK National Annex, with loads from Eurocode 1: wind (BS EN 1991-1-4) and snow (BS EN 1991-1-3) for your postcode. Steel Construction Institute guides P397 and P399 cover portal frames. A common starting size is a rafter about one fifty-fifth of the span deep, with a haunch about a tenth of the span long. The engineer's calculations then fix every member.

What standard is the steel made to?

Fabricated steelwork must meet BS EN 1090-1 and be UKCA or CE marked in Great Britain. Most buildings use execution class EXC2. The National Structural Steelwork Specification (NSSS) is the usual contract specification.

How much insulation does a heated building need?

In England, a new heated non-domestic building must have walls of U 0.26 W/m²K or better and a roof of U 0.18 or better, with windows at 1.6 and rooflights at 2.2. As a guide, 80 mm insulated panels are about U 0.23 to 0.25, so they suit walls but not a heated roof; 100 mm is around 0.18 to 0.21; 120 mm is about 0.15 to 0.17. Building control relies on the panel maker's data sheet. Unheated buildings don't have to meet these limits. These figures are from the 2021 guidance. A 2026 edition was published in March 2026 and applies from March 2027, with transition rules, so the limits for your building depend on when the work is submitted and started. An energy assessor confirms them.

How far can someone be from a way out?

The fire safety guidance (Approved Document B) uses travel distances. For normal industrial and storage use, about 25 m where there is only one way out, and 45 m where there are two or more. Shops, offices and higher-risk uses have shorter limits. Vehicle doors don't count as a way out, so most buildings need at least one personnel door or fire exit, and long ones need two. The 3D designer checks this as you add doors.

Are farm buildings different?

A building used for agriculture can be exempt from the Building Regulations if no one lives in it, it is at least one and a half times its height from any building where people sleep, and no point inside is more than 30 m from a fire exit. Farm buildings are designed to BS 5502-22: most are Class 2, with a design life of at least 20 years, and grain stores are usually Class 1. It may still need planning permission or prior approval.

Who is responsible for safety on site?

The Construction (Design and Management) Regulations 2015. The client has duties. Where more than one contractor works on site, a principal designer and a principal contractor must be appointed. Larger jobs must also be notified to the HSE. Since October 2023 the Building Regulations in England also name a client, a principal designer and a principal contractor, who must confirm in writing that the finished work complies.

Why can't a door go anywhere I like?

Because the frame is in the way. Doors and windows on the side walls fit between the steel columns. On the gable ends they avoid the gable posts, unless a wide vehicle door has a steel goalpost frame over it. The wall bracing needs a bay with no openings; if every bay has one, that side needs portal bracing instead. The side rails stop at every opening, with steel trimmers round it. The designer follows all of this, so what you draw can be built.

A plain-English summary for England, not legal advice. Wales, Scotland and Northern Ireland have their own rules, and building control and your engineer have the final say.

Frame and foundations

How is the frame made?

Frames are designed by structural engineers to Eurocode 3, using the wind and snow loads for your site, and fabricated to BS EN 1090 and galvanised to BS EN ISO 1461. Galvanising protects the steel inside and out for the life of the building.

What foundations will I need?

Usually a reinforced concrete pad under each column, with cast-in holding-down bolts, and a ground-bearing slab. Soft or made ground may need deeper pads or piles. Our engineers send a foundation plan with reinforcement and concrete specs that any groundworker can price and build from.

What if the ground is soft?

We arrange a ground investigation before the foundations are designed, so there are no surprises when digging starts. We also keep the frame as light as the design allows, which keeps the loads on the ground, and the foundation sizes, down.

Cold-rolled or hot-rolled steel?

Cold-rolled frames use light galvanised sections and suit spans up to about 15–20 m. They're quicker to make and cheaper on small buildings. Hot-rolled universal beams handle wider spans, taller eaves, cranes and heavy mezzanines. More on components →

Mezzanines and interiors

Can you include a mezzanine floor?

Yes. We source mezzanine floors and staircases and include them in your package, designed to fit the frame.

How strong does a mezzanine need to be?

Floors are rated by load per square metre, in kN/m². General office use is around 2.5–3.5 kN/m². Storage is usually 5 kN/m² or more, depending on what's stored and how high. Tell us the use and we'll design the floor, columns and pads to it.

Can you build offices and internal walls?

Yes. Internal walls are built from insulated panels, which go up quickly and can be fire-rated where you need separation, for example between a workshop and offices or a paint shop. On turnkey jobs we add doors, ceilings, finishes and electrics.

Cladding and fire

PIR or mineral wool panels?

PIR insulated panels give the best insulation for the thickness and suit most workshops and units. Mineral wool panels are heavier but non-combustible, so they're used for fire walls, near boundaries and in some insured premises.

Are the cladding details made to measure?

Yes. Flashings, trims and bespoke cladding details are made to measure, so corners, openings and junctions fit first time instead of being cut on site.

Does the frame need fire protection?

Many single-storey buildings don't. Protection is usually needed when the building is close to a boundary, has a mezzanine or upper floor in use, or is open to the public.

Where it suits the job, the intumescent coating is applied before the steel goes to site, which is quicker and cleaner than coating on site. The fire rating, typically 30 or 60 minutes, depends on the steel section and the coating thickness the coating designer specifies.

Erection and doing it yourself

Who puts the building up?

On supply-and-erect and turnkey jobs, the crew erects the frame once the pads have cured and the holding-down bolts are checked, using MEWPs and a crane. The frame is braced, plumbed, lined and bolted up; then come the purlins and rails, the roof, the walls, doors, windows, flashings and gutters. The floor slab often goes in once the roof is on.

Can I put the building up myself?

Yes. Because quotes show supply and erection separately, you can buy the kit only. Kits come with erection drawings and numbered parts. Frames over about 12 m span need a crane and trained operatives.

Can I do my own groundworks?

Yes, and many customers do. We send the foundation plan and holding-down bolt layout, and check the bolts before the steel arrives.

Guide: planning permission

National planning policy in 2026

The government published a rewritten National Planning Policy Framework (NPPF) on 17 August 2026, the first full rewrite since 2012. Its decision-making policies apply to applications decided from that date.

It replaces the old "tilted balance" with a permanent presumption in favour of sustainable development, and separates national decision-making policies from plan-making. Most of the changes are about housing, but the presumption and the grey belt rules apply to commercial and farm buildings too.

Your council's local plan still matters. Plans submitted for examination by 31 December 2026 are examined under the previous system. Ask us, or your planning officer, how the changes affect your site.

Planning and Building Regulations are different things

Planning permission is about whether a building should be there at all: its use, size, appearance and effect on neighbours and the landscape. Your local planning authority decides it. Building Regulations are about whether the building is safe and efficient: its structure, fire safety and energy use. Building control signs it off. Almost every new building needs Building Regulations approval, even when it doesn't need planning permission.

Commercial and industrial buildings

A new commercial building almost always needs full planning permission. Because a steel building is made to order, details such as height, door positions, cladding colour and landscaping can be adjusted before the application goes in, to suit the site and the planning officer.

There is one useful exception. In England, some extensions to existing industrial and warehouse buildings can be permitted development under Class H of Part 7 of the General Permitted Development Order, within limits on size, height and distance from the boundary. Sites in protected areas have tighter limits.

Agricultural buildings

On agricultural units of 5 hectares or more in England, many new farm buildings can be built under agricultural permitted development (Class A of Part 6). Since May 2024 a new building can cover up to 1,500 m² of ground, up from 1,000 m². There are also limits on height and distance from roads and houses, and buildings for livestock near homes have extra restrictions.

Permitted development doesn't mean you can just build. You must notify the council first, and they can ask for prior approval of the siting, design and external appearance. Smaller holdings, buildings over the limits, and buildings that aren't reasonably necessary for agriculture need full planning permission. Equestrian buildings for leisure use are not agricultural, so arenas and stables usually need full planning permission.

Protected landscapes and Green Belt

Where your site is matters as much as what you build.

  • National Parks and National Landscapes (formerly Areas of Outstanding Natural Beauty) expect buildings to fit the landscape. Dark, recessive colours, lower eaves and careful siting help.
  • Green Belt land only allows new buildings in limited cases, such as replacing or redeveloping previously developed land. "Grey belt" land, introduced in December 2024 and kept in the 2026 rewrite of national policy, may help some sites. It still has to pass several tests, including showing a need for the development, so it can help a case without guaranteeing approval.
  • Flood zones need a flood risk assessment, and floor levels may need to be raised.
  • Conservation areas and sites near listed buildings get extra scrutiny of design and materials.

Our areas section covers the protected landscapes and planning authorities across the South East.

What goes into an application
  • Site location plan and block plan
  • Elevations and floor plans of the building, with materials and colours
  • A design and access statement, for some applications
  • Supporting reports where needed: flood risk, ecology, drainage, transport or noise

We prepare the building drawings and can manage the application for you.

How long it takes

Councils aim to decide most applications within 8 weeks, or 13 weeks for major developments, such as buildings over 1,000 m². Agricultural prior notifications have a 28-day period. Allow time before that to prepare drawings and reports, and remember that fabrication can't start until the design is fixed.

Building Regulations

The main parts that apply to steel buildings are Part A (structure), Part B (fire safety) and Part L (energy). Our engineers' design pack includes the structural calculations, and our panel specifications include the U-values building control asks for. Some agricultural buildings are exempt from Building Regulations, but most commercial ones are not.

Tips for a smoother application
  • Talk to the planning officer early. Many councils offer pre-application advice.
  • Choose colours that suit the setting. Anthracite, olive green and grey usually sit better in the countryside than bright white.
  • Show landscaping and screening on your drawings.
  • Explain why the building is the size it is, especially on farms and in the Green Belt.

General guidance for England only. Rules differ in Wales, Scotland and Northern Ireland, and your local planning authority makes the decision.

Guide: choosing a supplier

1. Check the steel is made properly

Structural steel sold in the UK must be fabricated to BS EN 1090 and carry UKCA or CE marking. Ask which execution class the fabricator is certified to. EXC2 covers most portal frame buildings. If the supplier doesn't fabricate in-house, ask who does and see their certificate.

2. Ask for a site-specific structural design

A portal frame should be designed by a structural engineer to Eurocode 3, using the wind and snow loads for your postcode, height and exposure. A building on an exposed coastal or hilltop site needs more steel than the same building in a sheltered valley. Be wary of a price for a "standard" frame that ignores where it's going. Ask for the calculations; building control will want them anyway.

3. Ask what the quote includes

A good quote shows each part separately:

  • Steel frame, purlins and rails
  • Cladding, flashings, gutters and downpipes
  • Doors, windows and rooflights
  • Delivery, cranes and access equipment
  • Erection
  • Groundworks, if included

A clear list of what is included and what is not lets you compare like with like, and choose to do some work yourself or use your own groundworker.

4. Compare the cladding specification

Cladding is often the biggest difference between quotes. Single-skin sheet, 80 mm PIR panels, 100 mm PIR panels and mineral wool panels are very different products at very different prices. Check the thickness, core material, coating and the manufacturer's guarantee, which is often shorter near the coast.

5. Look at what's included, and what isn't

Delivery, cranes, drawings for planning, foundation design and building control support can all be extras. Ask directly. A cheaper quote that leaves them out can end up costing more.

6. Check accreditations and insurance

Health and safety schemes such as CHAS and SSIP, and Constructionline membership, show a contractor has been checked. Ask for proof of public liability and employer's liability insurance, and for erectors' training records for working at height and operating MEWPs.

7. Ask about warranties

Find out how long the frame is guaranteed for, who guarantees the cladding and doors, and what you need to do to keep the warranties valid. A structural warranty from the supplier, plus the manufacturers' guarantees registered in your name, is a good standard.

8. See real buildings and talk to customers

Ask for projects similar to yours, with photos and, ideally, a customer you can call. In trades like the motor industry and farming, people talk to each other, and a supplier with nothing to show is a risk.

9. Agree the programme and the price validity

Ask how long fabrication and erection will take, and how long the price is held. Steel prices moved sharply in 2026, so a quote without a validity date can change before you order.

Red flags
  • No structural calculations, or a frame that isn't designed for your site
  • A price much lower than everyone else's, with no breakdown
  • Out-of-date terms or prices from before this year's increases
  • Pressure to pay most of the price up front
  • No address, no projects and no references
Compare us on the same terms

Every BayFrame by JCPSA quote is itemised: it lists the building, delivery and installation separately. Start with a free first design in the 3D designer.