How it's built

How a steel building is built

Scroll down to watch a steel building go up in the order it's built on site, from the foundations to the cladding.

01 · GROUNDWORKS

Foundations first

The site is levelled and the concrete goes in. Every column gets a pad foundation, with holding-down bolts cast in exactly where the steel will stand. Pad sizes and bolt positions come from our engineers' foundation plan.

More on groundworks →

02 · THE FRAME

The steel frame goes up

A crane lifts the columns onto the bolts, then the rafters. The first bay goes up with its bracing, so it stands as a stiff box. It is plumbed, lined and levelled, then the rest of the frames follow from it, every 6 m or so. Each frame is two columns and two rafters, rigidly joined, so there are no posts in the middle of the floor.

Steel
Hot-rolled universal beams, hot-dip galvanised to BS EN ISO 1461
Made to
BS EN 1090, UKCA marked
Designed to
Eurocode 3, with wind and snow loads for your site
03 · ZOOM IN

Base plates and bolts

Each column stands on a steel base plate, bolted down to the holding-down bolts in the pad. That joint takes the frame's weight and the wind and snow loads into the ground.

04 · ZOOM IN

Where column meets rafter

This corner is where the frame works hardest. A haunch, a tapered piece welded under the rafter, deepens the section where the bending is greatest, so the rest of the rafter can be lighter. An end plate bolts it to the column with high-strength bolts.

05 · PURLINS AND RAILS

Purlins and side rails

Light, galvanised Z sections run the length of the building. On the roof they're called purlins, usually 1.5 to 1.8 m apart; on the walls they're side rails. They carry the cladding and stop the columns and rafters twisting. Short stays tie the inner flanges of the rafters and columns back to them, thin anti-sag rods keep the purlins straight, and an eaves beam runs along the column tops on each side.

06 · ROOF

The roof goes on first

Roof sheets or panels run from eaves to ridge and are fixed into the purlins. The roof usually goes on before the walls, so the building is under cover sooner and work inside can carry on in bad weather.

07 · WALLS

Then the walls, doors and windows

Wall panels fix to the side rails. Doors and windows go into their framed openings, and flashings and gutters seal every edge. On some jobs the floor slab is poured now, once the roof is on.

08 · CLADDING

One panel, three layers

Here's a single wall panel up close. In the factory, three layers are bonded together into one panel.

Outer skin
Coated steel, typically 0.4–0.7 mm, in your choice of colour
Core
PIR insulation, 80, 100 or 120 mm, or mineral wool where fire rating matters
Liner
Coated steel with a smooth or fine-ribbed finish inside
Insulation
Around 0.25 W/m²K at 80 mm PIR, 0.20 at 100 mm and 0.16 at 120 mm

Typical figures. Exact values depend on the panel product and are confirmed in your specification.

09 · CLADDING

How the cladding goes on

The bonded panel goes up as one piece. It sits against the side rails and is screwed through to them. Each panel locks into the next at the joint, and flashings cover the edges.

10 · YOUR TURN

Design your own

Choose the size, cladding, doors and windows in the 3D designer and send it to us for a quote. Then watch it go up step by step.

Up close

Every part of the frame

Pick a part to zoom in.

On site

What it looks like for real

Once the concrete base is laid, our team, working in groups of four or five, uses MEWPs to position and bolt the steel frame accurately. Next, we apply the insulated panels, roof, windows, doors and flashing. The completed building is then ready for the customer to adapt for its final purpose.

Foundations

The base it stands on

A concrete slab and a pad under every column, built from our engineer's foundation plan.

From order to a base ready for steel
  1. 1
    You order the building

    The frame is designed for your site's wind and snow loads, which sets the loads on the foundations.

  2. 2
    Our engineers design the foundations

    You get a foundation plan with the reinforcement types and quantities, the concrete specification and the holding-down bolt layout.

  3. 3
    A ground survey, if the ground needs one

    Where the soil is soft or unstable, a survey tells the engineer whether standard pads will do or whether deeper pads or piles are needed.

  4. 4
    The base is built to the plan

    Use any groundwork contractor you like, or let us do it as part of a turnkey job.

  5. 5
    The steel goes up

    Once the pads have cured and the holding-down bolt positions are checked, the crew erects the frame. See the build step by step →

Less weight, less foundation risk

We keep every frame as light as the design allows. A lighter building puts less load on the ground, which keeps pads smaller and reduces the risk of needing deeper foundations on poorer ground.

Column base plate on holding-down bolts, cast into a concrete pad.

The foundation plan
Pads
Size and depth of the concrete pad under each column
Slab
Thickness and specification of the ground-bearing floor slab
Reinforcement
Rebar types and quantities for pads and slab
Concrete
Concrete grade and specification
Bolts
Holding-down bolt positions and setting-out dimensions
Extras
Thickened areas under lifts, racking or mezzanine columns where needed

Questions

Groundwork questions

Can I use my own groundworker?

Yes. The foundation plan is written so any groundwork contractor can price and build it. Many customers save money this way.

Do I need a ground survey?

Only where the ground may be soft, unstable or made up. The survey tells our engineer whether standard pads are enough or whether deeper pads or piles are needed.

Can you do the groundworks for me?

Yes. On turnkey jobs we handle the foundations and slab as well as the building, so there's one programme and one point of contact.

When can the steel go up?

Once the pads have cured enough to take the load. We check the holding-down bolt positions before the steel arrives.

More detail

Programme, materials and options

From enquiry to handover, step by step
  1. 1
    Brief and site survey

    What the building is for, what goes inside, the site, access and services. Your 3D design is a good start.

  2. 2
    Concept design and drawings

    Plan, elevations and sections to scale, sized to the steel line, with the cladding at its real thickness.

  3. 3
    Planning permission

    From your council, or prior approval for some farm buildings. Allow 8 to 13 weeks.

  4. 4
    Structural design

    The engineer designs the frame to Eurocode 3 with the UK National Annex, using wind and snow loads for your postcode, and designs the foundations.

  5. 5
    Building Regulations approval

    Usually full plans to building control: structure (Part A), fire safety (Part B), insulation for heated buildings (Part L) and access (Part M).

  6. 6
    Fabrication and groundworks, side by side

    Steel is made to BS EN 1090 and UKCA marked while the pads go in with the holding-down bolts cast in.

  7. 7
    Erection

    Columns and rafters go up, the first bay is braced, then the frame is plumbed, lined and bolted up. Purlins and side rails follow.

  8. 8
    Envelope

    Roof first, then walls, then doors, windows, flashings, gutters and downpipes, so the building is weathertight.

  9. 9
    Floor slab and fit-out

    The slab often goes in once the roof is on. Then services, mezzanines, offices and lighting.

  10. 10
    Completion and handover

    Building control inspects and issues a completion certificate. You get as-built drawings, product information and the health and safety file required under CDM 2015.

Types of portal frame
Pitched-roof portal
Two columns and two rafters with a ridge in the middle. The most common steel building in the UK, usually at a 5° to 10° pitch.
With a mezzanine
The same frame with a floor inside over part of the building, often for offices.
Mono-pitch portal
One slope, for narrow buildings, lean-tos and canopies. Suits spans up to about 15 m.
Propped portal
A wide frame with a slim prop in the middle, for big spans where a central column is acceptable.
Tied portal
A tie between the eaves takes the spread, so the columns can be lighter. The tie reduces clear height.
Crane portal
Brackets on the columns carry crane rails for an overhead crane.
Mansard, curved and cellular
Shaped or perforated rafters, chosen for looks, height limits or long spans.

The 3D designer covers the pitched-roof portal, with or without a mezzanine, and open mono-pitch canopies. For the other types, ask us.

The rules of thumb engineers start from
Roof pitch
5° to 10°, and 6° is the most common
Frame spacing
6 to 8 m between frames
Haunch
About a tenth of the span long, cut from the same section as the rafter
Purlins
Usually 1.5 to 1.8 m apart, closer near the eaves
Bracing
Cross-bracing in the roof and walls of a braced bay, with eaves beams carrying the load along to it
Restraint
Stays from the purlins and rails to the inner flanges of the rafters and columns, always at the haunch
Column bases
Usually simple bolted bases. Near a boundary they are designed to hold the wall up in a fire.

These are starting points from Steel Construction Institute guidance. The structural engineer designs every frame to Eurocode 3 for its own site.

How a steel building is measured
How a steel portal frame building is measuredA cross-section of a portal frame with six numbered measurements: span to the steel line, size over the cladding, clear width between the columns, eaves height, clear height under the haunch, and roof pitch. 123456
1 span to the steel line, 2 over the cladding, 3 clear width, 4 eaves height, 5 clear height under the haunch, 6 roof pitch.
Span and length
To the steel line: the outside face of the steel frame. Grid lines sit on it.
Eaves height
From the finished floor to where the outside of the column meets the top of the rafter
Over the cladding
Bigger by the side rail and the panel on each clad wall: about 225 mm each side with 80 mm panels on 145 mm rails
Clear width
Between the inside faces of the columns, so the span less two column depths
Clear height
Under the haunches at the sides, rising to the apex in the middle. Door heights are limited by the eaves, less about 400 mm.

The 3D designer and our drawings show all three: to the steel line, over the cladding and clear inside.

An example programme: 10 to 16 weeks from order to keys

Fabrication runs while the groundworks go in, which is where most of the time is saved compared with masonry. Planning, if needed, comes first: allow 8 to 13 weeks.

Example programme. Yours is confirmed after the site survey.

Kit, supply and erect, or turnkey

Your quote is itemised for the option you choose, so you decide how much we take on.

TaskKitSupply and erectTurnkey
Survey and first designFreeFreeFree
Structural design and foundation planBayFrameBayFrameBayFrame
Planning and building control drawingsOptional extraOptional extraBayFrame
Foundations and floor slabYour groundworkerYour groundworkerBayFrame
Frame, purlins and railsSuppliedSupplied and erectedSupplied and erected
Sandwich panels, flashings, doorsSuppliedSupplied and fittedSupplied and fitted
Mezzanines, internal walls, electricsOptionalOptionalBayFrame
Delivery to mainland UKPriced separatelyPriced separatelyPriced separately
Cold-rolled or hot-rolled?

Both are proper structural steel. The choice comes down to span, eaves height and what the frame has to carry. Our frames are galvanised and fabricated to BS EN 1090, and designed to Eurocode 3.

Rule of thumb. Under about 15 m span with no crane or heavy mezzanine, cold-rolled is usually cheaper. Above 20 m, or with crane beams, hot-rolled is the norm.
Cold-rolledHot-rolled
SectionsLight galvanised C and Z sections, bolted back to backUniversal beams and columns
Typical spanUp to 15–20 mUp to 40 m+
EavesUp to about 6 mUp to 12 m and more
Cranes and heavy mezzaninesLimitedYes, designed in
Best forSmall workshops, garages, storesWarehouses, industrial units, showrooms
What the walls and roof are made of

An insulated sandwich panel is a steel outer skin and a steel liner bonded to an insulating core. One layer gives you the weatherproof outside, the insulation and the inside finish. We fit PIR panels for most buildings and mineral wool where fire rating matters, with flashings made to measure.

Section through an insulated panel, typically 80–100 mm thick.

Doors, windows and rooflights

Openings are framed into the steel, so decide them before the frame is designed. Door height is limited by the eaves, less about 400 mm for the door head and drum.

Sectional doors
Insulated panels that lift up and over. Best for heated buildings and frequent use.
Roller shutters
Steel slats on a drum above the opening. Compact and secure.
Personnel doors
Steel doors with panic hardware where a fire escape is needed.
Curtain walling
Full-height glazing for showrooms and receptions.
Rooflights
A ridge strip, or panels in each bay. About 10–15% of the roof is typical.

Seen enough?

Design your own building in 3D, or book a site survey.