1. Home
  2. Automotive
  3. Bodyshops and paint shops

Automotive · Accident repair and refinishing

Bodyshop and paint shop buildings

Repair bays, a clean prep zone and space for spray booths, with the frame designed around your booth supplier's layout and the extraction it needs.

  • 1–4booths
  • 6–7 meaves
  • 15–24 m clearspan
  • Freefirst design
3D render: Bodyshop and paint

Typical 18 × 30 m bodyshop

540 m² · supply and erect from £213/m²

KitSupply only, with erection drawingsFrom £88,000
Supply and erectThe building, plus installationFrom £115,000
TurnkeyPlus foundations, slab, lighting and powerFrom £204,000

All prices exclude VAT. Guide prices. Delivery is priced separately. Itemised written quote after a site survey. Cost guide →

The example shown

What this example includes

This is the building in the picture and the guide prices above. Every item can be changed in the 3D designer.

  • Clear-span steel frame18 m wide with no posts inside · 6 frames
  • Size18 × 30 m · 540 m² · 6 m to the eaves
  • Gable door4 m wide × 4.5 m high
    x1
  • Side doors4 m wide × 4.5 m high each
    x3
  • Windows3 × 1 m each
    x2
  • Walk-through doorsFor people, separate from the vehicle doors
    x2
  • Insulated walls and roof80 mm PIR insulated panels
  • ColoursWalls: White aluminium, RAL 9006Roof: White aluminium, RAL 9006Trims: Anthracite, RAL 7016
  • RooflightsRidge strip, 24 × 1.2 m
  • Design and drawingsDesigned for the wind and snow at your site, with a foundation plan

Delivery and installation are not included in the building price; each is priced separately. What is in the price, and what is not →

Ready-made

Enquire about this building

Bodyshop and paint, 18 × 30 m, as shown. Nothing to design.

Rough cost, excluding VATFrom £88,000The building only (kit)

All prices exclude VAT. We reply with an itemised quote. Your details are used only to reply. Privacy

Before you design

Planning a bodyshop: decide these first

  1. Start with the spray boothThe booth and oven set the height, and their flues go through the roof. The roof steel is designed around those openings.
  2. Work in a lineStrip, panel, prep, paint, refit and valet should follow each other so cars never cross paths.
  3. PermitsSpraying may need an environmental permit from your council. Ask before you fix the layout.
  4. Keep dust away from paintSeparate the preparation area from the paint area with a wall, not a curtain.
  5. LightColour matching needs bright, even light. Decide where rooflights help and where they would cause glare.
  6. Air and powerCompressed air and three-phase runs are easiest to plan before the slab and the cladding.

More detail

The details

What this building does
  • Room for the booths

    Clear height and floor space for combined spray and bake booths, with roof penetrations for their stacks.

  • Repair and jig bays

    Bays for strip, repair and a jig or frame bench, with thickened slab where the bench is anchored.

  • Clean and dirty zones

    Prep, paint and reassembly kept apart from panel work to cut dust in the booth.

  • Fire separation

    Mineral wool panels or fire-rated walls where your insurer or Building Regulations need separation.

Typical specification

18 × 30 m bodyshop

Size
18 m span × 30 m long, to the steel line
Outside the cladding
18.45 × 30.45 m
Floor area
540 m²
Eaves height
6 m to the steel line
Height to ridge
7.25 m to the top of the roof
Clear inside
17.19 m between columns, about 5.3 m under the haunches
Roof pitch
6°
Frames
6 frames, 5 bays at 6.00 m centres
Cladding
80 mm PIR insulated panels
Colours
Walls RAL 9006 White aluminium · roof RAL 9006 White aluminium
Side doors
3 × 4 m wide × 4.5 m high
Gable doors
1 × 4 m wide × 4.5 m high
Personnel doors
2
Windows
2 × 3 × 1 m
Rooflights
Ridge strip, 24 × 1.2 m
Mezzanine
None
Fire protection
Not included

This is the starting point in the 3D designer. Every item can be changed.

What every building comes with

Every building is designed for the wind and snow at your site, and comes with a foundation plan for your groundworker and an itemised written quote for the option you choose: kit, supply and erect, or turnkey. Delivery and installation are not included in the building price; each is priced separately.

What is in the price, and what is not →

Things a bodyshop building has to get right

Paint shops have more rules than most workshops. We design the building around them early, so nothing has to be cut in later.

General guidance only. Your local council and insurer confirm what applies to your site.

Booth supplier first
We start from the booth maker's layout: footprint, height, stack positions and service clearances.
Environmental permit
Vehicle refinishing with solvent-based products can need an environmental permit from your local council. Check this early.
Solvent and paint storage
A separate, ventilated paint mixing and store room, sized to the quantities you keep.
Insurance
Insurers often have their own fire and construction requirements for paint shops. Share them with us at survey.
Size it by booths and bays

Booths set the eaves, repair bays set the length.

BodyshopTypical sizeEavesBooths
Smart repair and small refinishing12 × 18 m5 m1
Independent repairer18 × 30 m6 m1–2
Insurer-approved repair centre24 × 42 m6.5 m2–3
Large accident repair centre30 × 60 m7 m3–4

Guide sizes only. Booth suppliers confirm the clear height and service space their booths need.

What changes cost

Estimated change from the typical building above, supply and erect, ex VAT. Worked out with the same model as the 3D designer.

  • Switch to mineral wool panelsNon-combustible walls and rooffrom +£25,000
  • Add fire protection to the frameIntumescent coatingfrom +£14,500
  • Add a 15% mezzaninePaint store, offices or partsfrom +£30,000
  • Raise the eaves to 7 mClearance for taller booths and stacksfrom +£6,500
  • Lengthen to 36 mOne more 6 m bayfrom +£15,000
  • Go turnkeyWe add foundations, slab, lighting and powerfrom +£84,500
Check it fits. Open this bodyshop in the 3D designer, then add cars and vans to check bays and door heights.
Open in the 3D designer
Common questions
Do you supply the spray booths?

No. We work with your booth supplier, design the building around their layout and coordinate the roof openings, bases and power.

Does a paint shop need fire-rated cladding?

Not always, but often. It depends on boundary distances, the size of the building and your insurer. Mineral wool panels are the usual choice where it's needed.

Do I need an environmental permit?

Vehicle refinishing using solvent-based coatings above set thresholds needs a permit from your local council in England and Wales. We can point you to the right team, but the application is yours.

More advice and FAQs →

Planning and rules, in brief

  • Planning permission. Most new buildings need it. Your council decides.
  • Building Regulations. Almost every new building needs approval. Building control checks the structure, fire safety and, in heated buildings, the insulation.
  • The frame. Designed by a structural engineer to Eurocode 3, for the wind and snow at your site.

A guide for England, not legal advice. The rules we design to →

Design your bodyshop

Open this bodyshop in the 3D designer and set the bays, doors and cladding.