1. Home
  2. Automotive
  3. Valet and car prep

Automotive · Valeting and used car prep

Valet and car prep centres

Drive-through wash bays, dry prep bays and a photo bay under one roof, so used stock goes from delivery to forecourt-ready without moving between buildings.

  • 2–8bays
  • 4–5 meaves
  • Drive-throughdoors
  • Freefirst design
3D render: Valet and car prep

Typical 12 × 18 m valet and prep centre

216 m² · supply and erect from £231/m²

KitSupply only, with erection drawingsFrom £38,000
Supply and erectThe building, plus installationFrom £50,000
TurnkeyPlus foundations, slab, lighting and powerFrom £88,000

All prices exclude VAT. Guide prices. Delivery is priced separately. Itemised written quote after a site survey. Cost guide →

The example shown

What this example includes

This is the building in the picture and the guide prices above. Every item can be changed in the 3D designer.

  • Clear-span steel frame12 m wide with no posts inside · 4 frames
  • Size12 × 18 m · 216 m² · 4.5 m to the eaves
  • Gable door3.5 m wide × 3.5 m high
    x1
  • Side doors3.5 m wide × 3.5 m high each
    x2
  • Windows2.5 × 1 m each
    x2
  • Walk-through doorFor people, separate from the vehicle doors
    x1
  • Insulated walls and roof80 mm PIR insulated panels
  • ColoursWalls: Grey white, RAL 9002Roof: White aluminium, RAL 9006Trims: Anthracite, RAL 7016
  • RooflightsRooflight panels in each bay
  • Design and drawingsDesigned for the wind and snow at your site, with a foundation plan

Delivery and installation are not included in the building price; each is priced separately. What is in the price, and what is not →

Ready-made

Enquire about this building

Valet and car prep, 12 × 18 m, as shown. Nothing to design.

Rough cost, excluding VATFrom £38,000The building only (kit)

All prices exclude VAT. We reply with an itemised quote. Your details are used only to reply. Privacy

Before you design

Planning a valet and car prep centre: decide these first

  1. Water comes firstWashing vehicles produces trade effluent. You need your water company's consent to discharge it, usually through an interceptor.
  2. Wet and dryKeep the wash bays apart from polishing and photography. The floor falls and drains are formed in the slab.
  3. Drive throughA door at each end lets cars move forward through wash, dry and finish without reversing.
  4. Built for the wetWet bays need galvanised steel and wall linings that can be hosed down.
  5. Light to inspect byEven, bright light shows marks in paintwork. Plan it with the roof and any rooflights.
  6. DryingVentilation and some heat stop the building staying damp.

More detail

The details

What this building does
  • Wet and dry zones

    A drive-through wash bay at one end, with dry prep and detailing bays kept apart.

  • Drive-through flow

    Doors on both gables or both sides, so cars never reverse out through the building.

  • Built for humidity

    Insulated panels and ventilation to manage condensation from washing and drying.

  • Even light for photos

    Rooflights plus a bay with even, colour-accurate lighting for listing photos.

Typical specification

12 × 18 m valet and prep centre

Size
12 m span × 18 m long, to the steel line
Outside the cladding
12.45 × 18.45 m
Floor area
216 m²
Eaves height
4.5 m to the steel line
Height to ridge
5.44 m to the top of the roof
Clear inside
11.39 m between columns, about 4.0 m under the haunches
Roof pitch
6°
Frames
4 frames, 3 bays at 6.00 m centres
Cladding
80 mm PIR insulated panels
Colours
Walls RAL 9002 Grey white · roof RAL 9006 White aluminium
Side doors
2 × 3.5 m wide × 3.5 m high
Gable doors
1 × 3.5 m wide × 3.5 m high
Personnel doors
1
Windows
2 × 2.5 × 1 m
Rooflights
Rooflight panels in each bay
Mezzanine
None
Fire protection
Not included

This is the starting point in the 3D designer. Every item can be changed.

What every building comes with

Every building is designed for the wind and snow at your site, and comes with a foundation plan for your groundworker and an itemised written quote for the option you choose: kit, supply and erect, or turnkey. Delivery and installation are not included in the building price; each is priced separately.

What is in the price, and what is not →

Plan the drainage first

Wash water carries oil, detergent and silt. It can't go into surface water drains, so drainage is designed with the slab.

General guidance only. Your water company and building control confirm what applies on your site.

Interceptor
Wash bay drainage usually runs through a silt trap and oil interceptor before it reaches the sewer.
Trade effluent consent
Discharging wash water to the public sewer normally needs consent from your water company.
Water recycling
Recycling units cut water bills and the volume you discharge. Leave space and power for one.
Falls and channels
The slab is laid to falls with channel drains across the wash bay.
Size it by throughput

Start from how many cars you prepare a day.

ThroughputTypical sizeEavesBays
Up to 10 cars a day10 × 15 m4 m1 wash + 2 prep
10–25 cars a day12 × 18 m4.5 m1 wash + 3 prep
25–50 cars a day15 × 30 m5 m2 wash + 5 prep + photo
Group prep centre18 × 42 m5 mProduction line

Guide sizes only. Allow at least one bay for vans if you prepare light commercials.

What changes cost

Estimated change from the typical building above, supply and erect, ex VAT. Worked out with the same model as the 3D designer.

  • Add a third side doorSeparate in and out for the photo bayfrom +£3,000
  • Lengthen to 24 mOne more 6 m bayfrom +£10,000
  • Upgrade to 100 mm PIR panelsBetter against condensationfrom +£2,500
  • Raise the eaves to 5 mRoom for vans on a liftfrom +£2,000
  • Add four windowsDaylight for detailingfrom +£5,500
  • Go turnkeyWe add foundations, slab, lighting and powerfrom +£35,500
Check it fits. Open this prep centre in the 3D designer and add cars and vans to plan the bays.
Open in the 3D designer
Common questions
Does a wash bay need special drainage?

Yes. Wash water should go through a silt trap and oil interceptor, and discharging to the sewer usually needs trade effluent consent from your water company.

Will the building suffer from condensation?

Washing and drying puts a lot of moisture in the air. Insulated panels, extract fans and good door seals keep it under control.

Can the prep centre share a building with the workshop?

Yes, with a dividing wall between wet and dry areas. A portal frame can be split into zones without internal columns.

More advice and FAQs →

Planning and rules, in brief

  • Planning permission. Most new buildings need it. Your council decides.
  • Building Regulations. Almost every new building needs approval. Building control checks the structure, fire safety and, in heated buildings, the insulation.
  • The frame. Designed by a structural engineer to Eurocode 3, for the wind and snow at your site.

A guide for England, not legal advice. The rules we design to →

Design your prep centre

Open this layout in the 3D designer and set the bays and doors.