A clear production floor with offices on a mezzanine over one end, loading doors on two sides and a frame designed for the loads you'll put on it.

  • 15–30 mspans
  • 6–8 meaves
  • Up to 60%mezzanine
  • Freefirst design
3D render: Industrial unit

Typical 18 × 30 m industrial unit

540 m² · supply and erect from £289/m²

KitSupply only, with erection drawingsFrom £120,000
Supply and erectThe building, plus installationFrom £156,000
TurnkeyPlus foundations, slab, lighting and powerFrom £245,000

All prices exclude VAT. Guide prices. Delivery is priced separately. Itemised written quote after a site survey. Cost guide →

The example shown

What this example includes

This is the building in the picture and the guide prices above. Every item can be changed in the 3D designer.

  • Clear-span steel frame18 m wide with no posts inside · 6 frames
  • Size18 × 30 m · 540 m² · 6 m to the eaves
  • Gable door5 m wide × 5 m high
    x1
  • Side doors5 m wide × 5 m high each
    x2
  • Windows3 × 1 m each
    x4
  • Walk-through doorsFor people, separate from the vehicle doors
    x2
  • Insulated walls and roof80 mm PIR insulated panels
  • ColoursWalls: White aluminium, RAL 9006Roof: White aluminium, RAL 9006Trims: Gentian blue, RAL 5010
  • RooflightsRidge strip, 24 × 1.2 m
  • Mezzanine floorAbout 108 m² (20% of the floor), sourced for you
  • Fire protectionIntumescent coating on the steel frame
  • Design and drawingsDesigned for the wind and snow at your site, with a foundation plan

Delivery and installation are not included in the building price; each is priced separately. What is in the price, and what is not →

Ready-made

Enquire about this building

Industrial unit, 18 × 30 m, as shown. Nothing to design.

Rough cost, excluding VATFrom £120,000The building only (kit)

All prices exclude VAT. We reply with an itemised quote. Your details are used only to reply. Privacy

Before you design

Planning an industrial unit: decide these first

  1. Draw the process firstSketch the route goods take from delivery to dispatch before you fix the size. The building should follow the flow, not the other way round.
  2. Heavy machines and rackingTell us about them early. They decide how thick the floor slab is and where its joints go.
  3. Cranes, air and extractionAn overhead crane, compressed air or fume extraction changes the frame and the eaves height. All three are hard to add later.
  4. Where the offices goOffices on a mezzanine save floor space, but they change the fire escape routes and the windows you need.
  5. Electricity supplyCheck what supply the site has. A new three-phase connection can take longer to arrive than the building.
  6. The yardLeave room outside for lorries to turn, wait and unload without blocking the doors.

More detail

The details

What this building does
  • Offices over the floor

    A 20% steel mezzanine on this layout gives office or storage space without using the production floor.

  • Fire protection included

    Intumescent coating on the frame where a mezzanine or a boundary means it's needed.

  • Loading on two sides

    5 m sectional doors on the side and gable, sized for forklifts and vans.

  • A clear production floor

    No internal columns across the 18 m span, so you can lay out machines and lines freely.

Typical specification

18 × 30 m industrial unit

Size
18 m span × 30 m long, to the steel line
Outside the cladding
18.45 × 30.45 m
Floor area
540 m²
Eaves height
6 m to the steel line
Height to ridge
7.25 m to the top of the roof
Clear inside
17.19 m between columns, about 5.3 m under the haunches
Roof pitch
6°
Frames
6 frames, 5 bays at 6.00 m centres
Cladding
80 mm PIR insulated panels
Colours
Walls RAL 9006 White aluminium · roof RAL 9006 White aluminium
Side doors
2 × 5 m wide × 5 m high
Gable doors
1 × 5 m wide × 5 m high
Personnel doors
2
Windows
4 × 3 × 1 m
Rooflights
Ridge strip, 24 × 1.2 m
Mezzanine
20% of floor, about 108 m²
Fire protection
Intumescent coating

This is the starting point in the 3D designer. Every item can be changed.

What every building comes with

Every building is designed for the wind and snow at your site, and comes with a foundation plan for your groundworker and an itemised written quote for the option you choose: kit, supply and erect, or turnkey. Delivery and installation are not included in the building price; each is priced separately.

What is in the price, and what is not →

Match the unit to the operation

Most industrial customers start from floor area, then set the eaves from racking, cranes or extraction.

OperationTypical sizeEavesMezzanine
Light assembly or trade counter15 × 25 m6 mOffice, 15–20%
Manufacturing with offices over18 × 30 m6 mOffice, 20%
Engineering with overhead crane20 × 40 m8 mOptional
Food or clean production24 × 36 m7 mPlant deck

Guide sizes only. Mezzanines for storage are designed to a higher floor load than offices.

What changes cost

Estimated change from the typical building above, supply and erect, ex VAT. Worked out with the same model as the 3D designer.

  • Increase the mezzanine to 40%More office or storage spacefrom +£21,000
  • Raise the eaves to 8 mRoom for racking or a cranefrom +£13,000
  • Add a third loading doorSeparate goods in and outfrom +£6,000
  • Switch to mineral wool panelsNon-combustible walls near a boundaryfrom +£25,000
  • Lengthen to 36 mOne more 6 m bayfrom +£22,000
  • Go turnkeyWe add foundations, slab, lighting and powerfrom +£84,500
Check it fits. The 3D designer opens this unit with a forklift, two racking runs and a van. It checks headroom under the mezzanine as well as under the eaves.
Open in the 3D designer
Common questions
How strong should the mezzanine floor be?

General office use is around 2.5–3.5 kN/m². Storage is usually 5 kN/m² or more. Tell us what goes on it and we'll design the floor, columns and pads to suit.

When does the frame need fire protection?

Usually when there's a mezzanine or upper floor in use, when the building is close to a boundary, or when it's open to the public. Intumescent coating typically gives 30 or 60 minutes.

Can you add offices inside the unit?

Yes. On turnkey builds we fit partitioned offices, welfare and kitchen areas, either on the ground floor or on the mezzanine.

More advice and FAQs →

Planning and rules, in brief

  • Planning permission. Most new buildings need it. Your council decides.
  • Building Regulations. Almost every new building needs approval. Building control checks the structure, fire safety and, in heated buildings, the insulation.
  • The frame. Designed by a structural engineer to Eurocode 3, for the wind and snow at your site.

A guide for England, not legal advice. The rules we design to →

Design your industrial unit

Open this unit in the 3D designer and change the size, mezzanine and doors.